This project was designed to maximise the space at the boundary of this site. As seen from the photo to the top right there was limited space for further excavation. This project was also very tight for space and so the hand held equipment used to install Stabilisure Geopins was a suitable alternative to larger an bulker installation methods. The slope was faced using Tobermore Secura Grand retaining wall blocks.